综合管廊电力舱长距离通风分区关键技术研究

李鑫宇, 赵光辉, 许淑惠   

  1. (北京建筑大学 北京市建筑能源高效综合利用工程中心,北京 102616)
  • 出版日期:2023-12-15 发布日期:2023-12-15
  • 作者简介:李鑫宇(1999- ),北京建筑大学北京市建筑能源高效综合利用工程中心硕士研究生,主要从事建筑地下安全及通风研究,北京市大兴区黄村永源路15号北京建筑大学大兴校区,102616。

Research on key technologies for long distance ventilation zoning in the power cabin of the comprehensive pipe corridor

Li Xinyu, Zhao Guanghui, Xu Shuhui   

  1. (Beijing Engineering Research Center of Sustainable Energy and Buildings, Beijing University of Civil Engineering and Architecture,Beijing 102616,China)
  • Online:2023-12-15 Published:2023-12-15

摘要: 为探究长距离综合管廊电力舱内通风关键技术,选取北京某综合管廊电力舱和燃气舱进行试验测试和数值模拟研究。研究得到:电力舱通风中沿程存在较大漏风,漏风主要发生在逃生口和分支管廊处,单个逃生口的漏风量约为5.6%,单个分支管廊的漏风量约为8.4%;电力舱长距离通风分区通风时断面风速应保持在0.1 m/s以上,若通风分区较长或分支管廊较多时应每200 m加设风量为总风量30%的射流风机一台;通风长度600 m及以下可采用自然进、机械排的通风方式,600 m以上应采用机械进、机械排的通风方式;管廊的阻力主要是进口段和防火门处产生的阻力,进口段阻力为165~200 Pa,防火门处阻力约为35 Pa;长距离通风时也应考虑沿程阻力,沿程阻力系数约为0.68。

关键词: 综合管廊, 燃气舱, 电力舱, 通风分区, 断面风速, 测试, 数值模拟

Abstract: In order to explore the key technologies of ventilation in the power cabin of a long—distance comprehensive pipe gallery, experimental testing and numerical simulation research were conducted on the power cabin and gas cabin of a certain comprehensive pipe gallery in Beijing. Research has shown that there is significant air leakage along the ventilation of the power cabin, mainly occurring at escape exits and branch pipe galleries. The air leakage rate for a single escape exit is about 5.6%, and the air leakage rate for a single branch pipe gallery is about 8.4%. During long—distance ventilation in the power cabin, the cross—sectional wind speed should be maintained above 0.1 m/s. If the ventilation zone is long or there are many branch pipe galleries, an additional jet fan with an air volume of 30% of the total air volume should be installed every 200 m. Ventilation with a length of 600 m or less can be achieved through natural intake and mechanical exhaust, while ventilation with a length of 600 m or more should be achieved through mechanical intake and mechanical exhaust. The resistance of the pipe gallery is mainly generated at the inlet section and the fire door. The resistance at the inlet section is between 165 Pa and 200 Pa, and the resistance at the fire door is about 35 Pa. During long—distance ventilation, the resistance along the way should also be considered, and the resistance coeffcient along the way is about 0.68.

Key words: comprehensive pipe gallery, gas tank, electric cabin, ventilation zoning, cross section wind speed, testing, numerical simulation